WIP Wednesday: 31/52

I am having such a good knitting week. I think I’m still riding high from getting the back up yarn for my sweater with the same dye lot as the yarn I’ve been working with.

I managed to get a few more stripes done on my sweater this week. I have not been making as much progress lately, as I have actually had a social life in the evenings. 20180808_1356488293482035834169711.jpg

I still adore the sweater, and hope to get lots of work done on it next week. That might be hard though, as shawl knitting is a little addictive. All I work on at naps is my shawl, but it has only been a few days of work, so it looks like I just started it. I’m working with a needle that has a very twisted and stiff cord, which is annoying and slows me down. I have another needle of the same size, but I’m using that for my sweater.20180808_1356124190412273447203204.jpg

The socks are coming along. I have a little over an inch to work before I start the toe of the second sock. If I only had two projects on the needles instead of three I would probably be done with them by the end of the week. I am only working on these while the kids play or eat. They are easy to pick up and put down without much thought. I love how these look. It’s the first pair of 3×2 rib socks I’ve made for John. I love how 3×2 socks fit, and I’m hoping he feels the same way. 20180808_1355263962098577663273185.jpg

I hope you are getting some good knitting done this week.

4 thoughts on “WIP Wednesday: 31/52

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s